History
TBEC Tha Chang Biogas Project 1 is TBEC first biogas project usingwastewater from palm mill and rubber factoryas feedstock. It is the cooperation between Thachang Oil Palm Industry Co., Ltd., Thachang Rubber Co., Ltd and TBEC under BOOT contract. The project started operation in early 2009. In late 2009, TBEC decided to increase the capacity of the Project from 1.4 MW to 2.8 MW. The project was registered as a CDM projects inOctober2010.It has been developed, designed, constructed and operated in accordance with Gold Standard criteria.
.
Address & Map
Location 111 Moo 3, Tha Chang, Tha Chang, SuratThani, 84150 Thailand.
.
Production Process
.
Building
Building
Cover Lagoon Bio Reactor (CLBR)
Flare
Bio Scrubber
Gas System
Control room
Generator