TBEC
Tha Chang (TCP) Biogas Project is TBEC first biogas
project that uses palm oil and rubber factory wastewater
as feedstock. It is the first such project in Thailand
build under BOOT structure. The project started operations
in early 2009. In late 2009 TBEC decided to increase the
capacity of the Project from 1.4 MW to 2.8 MW as the biogas
production surpassed all expectations. The project is
expected to be registered before the end of January 2010.
The Project has been developed, designed, constructed
and is operated in accordance with Gold Standard criteria.
.
Address
& Map
111 Moo 3, Tha Chang,
Tha Chang, Surat Thani, Thailand.